Skip to content

Evidence

Documentation · Roadmap

Proof that each roadmap step’s exit gate was met: test results, measurements, reviews and explanations. A step is marked Done in the schedule only when its evidence file is here.

Files are named <step>-<topic>.md, for example 1.01-accounting-foundations.md.

Step Evidence Result
1.01 Accounting foundations Passed; accounting review pending
1.02 Architecture decisions Passed
1.03 Invariants, threat model and regulation Passed; regulatory answers pending
1.04 Money, currency and identifier types Passed
1.05 Chart of accounts and account model Passed; accounting review pending
1.06 Journal entries and posting rules Passed
1.07 Reference ledger (the oracle) Passed
1.08 PostgreSQL schema v1 Passed
1.09 Atomic posting Passed
1.10 Concurrency control Passed
1.11 Idempotency Passed
1.12 Reversals and adjustments Passed
1.13 Balance verification Passed
1.14 Holds and two-phase operations Passed
1.15 Failure injection and crash recovery Passed
1.16 Phase 1 exit review and baseline benchmark Passed; Phase 1 gate met
2.01 Posting templates Passed
2.02 Deposits, withdrawals, clearing and suspense Passed
2.03 Transfers, merchant payments and fees Passed
2.04 Refunds and disputes Passed; dispute policy review pending
2.05 Accounting periods and closing Passed
2.06 REST API design Passed; contract review pending
2.07 REST API implementation Passed
2.08 Authentication, authorization and privilege separation Passed
2.09 Audit logging and tamper evidence Passed; chain head bottleneck recorded for 3.03
2.10 Offline protocol design Passed; external security review requested, card chip confirmation pending
2.11 Device registry and voucher issuance Passed; tier C only until attestation is verified; firmware handover pending
2.12 Receipt ingestion and settlement Passed
2.13 Gaps, conflicts, expiry, rejections and disputes Passed; late receipts follow ADR-0019’s loss policy, not suspense
2.14 Offline deterministic simulation Built; planted bugs caught, seeds reproduce across machines; 14 clean nights pending
2.15 Reconciliation (internal, external, offline) Passed; every planted break found, zero false matches, a million items in under two minutes
2.16 Phase 2 security review and exit Review passed: no open high or critical finding, every abuse case passes; the Phase 2 gate and v0.2.0-functional wait for 2.14’s 14 clean nights