Evidence
Proof that each roadmap step’s exit gate was met: test results, measurements, reviews and explanations. A step is marked Done in the schedule only when its evidence file is here.
Files are named <step>-<topic>.md, for example
1.01-accounting-foundations.md.
| Step | Evidence | Result |
|---|---|---|
| 1.01 | Accounting foundations | Passed; accounting review pending |
| 1.02 | Architecture decisions | Passed |
| 1.03 | Invariants, threat model and regulation | Passed; regulatory answers pending |
| 1.04 | Money, currency and identifier types | Passed |
| 1.05 | Chart of accounts and account model | Passed; accounting review pending |
| 1.06 | Journal entries and posting rules | Passed |
| 1.07 | Reference ledger (the oracle) | Passed |
| 1.08 | PostgreSQL schema v1 | Passed |
| 1.09 | Atomic posting | Passed |
| 1.10 | Concurrency control | Passed |
| 1.11 | Idempotency | Passed |
| 1.12 | Reversals and adjustments | Passed |
| 1.13 | Balance verification | Passed |
| 1.14 | Holds and two-phase operations | Passed |
| 1.15 | Failure injection and crash recovery | Passed |
| 1.16 | Phase 1 exit review and baseline benchmark | Passed; Phase 1 gate met |
| 2.01 | Posting templates | Passed |
| 2.02 | Deposits, withdrawals, clearing and suspense | Passed |
| 2.03 | Transfers, merchant payments and fees | Passed |
| 2.04 | Refunds and disputes | Passed; dispute policy review pending |
| 2.05 | Accounting periods and closing | Passed |
| 2.06 | REST API design | Passed; contract review pending |
| 2.07 | REST API implementation | Passed |
| 2.08 | Authentication, authorization and privilege separation | Passed |
| 2.09 | Audit logging and tamper evidence | Passed; chain head bottleneck recorded for 3.03 |
| 2.10 | Offline protocol design | Passed; external security review requested, card chip confirmation pending |
| 2.11 | Device registry and voucher issuance | Passed; tier C only until attestation is verified; firmware handover pending |
| 2.12 | Receipt ingestion and settlement | Passed |
| 2.13 | Gaps, conflicts, expiry, rejections and disputes | Passed; late receipts follow ADR-0019’s loss policy, not suspense |
| 2.14 | Offline deterministic simulation | Built; planted bugs caught, seeds reproduce across machines; 14 clean nights pending |
| 2.15 | Reconciliation (internal, external, offline) | Passed; every planted break found, zero false matches, a million items in under two minutes |
| 2.16 | Phase 2 security review and exit | Review passed: no open high or critical finding, every abuse case passes; the Phase 2 gate and v0.2.0-functional wait for 2.14’s 14 clean nights |