3.10 Backups, Point-in-Time Recovery and Disaster Recovery

Phase 3: Scale, Operations and Client Integration · Previous: 3.09 Observability: Logs, Metrics, Dashboards, Alerts · Next: 3.11 Deployment and CI/CD


1. Overall Objective Be able to restore the ledger to any point in time and prove the restore is correct.

2. The Problem We Are Solving An untested backup is a hope, not a backup. Money data cannot be lost.

3. Concepts and Research

  • WAL archiving.
  • Base backups.
  • pgBackRest vs WAL-G (choose one).
  • RPO and RTO definitions.
  • Streaming replication for HA vs DR.
  • Encryption of backups.
  • Off-site copies.

4. Implementation Tasks

  • Configure pgBackRest with encrypted, off-site storage.
  • Define RPO/RTO in an ADR.
  • A restore script that restores to a timestamp, runs verify and the chain verify, then compares with the checkpoint.
  • A monthly restore drill job.

5. Testing Requirements

  • Recovery tests: restore to a timestamp mid-load; all entries acknowledged before that time are present and verify is clean.
  • Total loss of the primary → restore within the RTO (timed).

6. Deliverables Backup configuration, restore tooling and the DR runbook.

7. Acceptance Criteria Two successful timed restore drills recorded.

8. Dependencies Steps 1.13, 2.09.

9. Estimated Difficulty High.

10. Exit Gate A restore drill is performed by following only the runbook.