3.16 Shadow Operation, Discrepancy Resolution and Phase 3 Exit

Phase 3: Scale, Operations and Client Integration · Previous: 3.15 Shadow Mode Implementation · Next: 4.01 Full-System Fault Injection and Recovery Game Day


1. Overall Objective Fix every root cause the shadow run reveals, and pass the Phase 3 gate.

2. The Problem We Are Solving Each discrepancy is a bug in one of the two ledgers, and both matter.

3. Concepts and Research

  • Root cause analysis.
  • Distinguishing a model bug, a mapping bug, a timing artefact and an old-ledger bug.

4. Implementation Tasks

  • Triage and fix each discrepancy.
  • Add a regression test for each root cause.
  • Rerun the benchmarks on production-like volumes.
  • Tag v0.9.0-rc-shadow.

5. Testing Requirements

  • Regression tests for every discrepancy found.
  • The full suite and nightly simulator stay green.

6. Deliverables Discrepancy log with root causes, and the release tag.

7. Acceptance Criteria 14 consecutive days with zero unexplained discrepancies.

8. Dependencies Step 3.15.

9. Estimated Difficulty High.

10. Exit Gate (Phase 3 Gate)

  • Shadow mode clean for 14 days.
  • Performance targets met.
  • Backups proven.
  • Alerts tested.

Shadow mode continues through steps 4.01–4.04.